Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Peugeot Bipper Beep Beep

Wed, 05 Dec 2007

By Ben Whitworth First Official Pictures 05 December 2007 10:00 A Bipper Beep Beep... now there's a name to be proud of Yes, indeed. We thought Citroen's Nemo was a bit of a joke name, but the Beep Beep takes the silly name game on to the next level.

New Audi S1: 231hp, sub-£25k price

Wed, 12 Feb 2014

Pictures and full details of the Audi S1 have been released ahead of the car’s public debut at the Geneva Motor Show next month. If the bright yellow colour of the car pictured doesn’t grab you, the stats probably will – this pocket rocket has four-wheel drive, a 0-62mph time of just 5.8 seconds and prices starting from less than £25,000 (just). Audi Audi S1: what's new?

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.